THE AVIORE METHOD

The AVIORE Method.

One vision. Every decision. Through to opening.

Five connected phases. One governing standard. The Experiential Brief begins with the experience the principal intends and remains the reference through design, commercial decisions, delivery and opening.

AVIORE defines and evaluates. The client decides.

THE METHOD / VISUAL OVERVIEW

Six disciplines.
Five governing phases.

The fifth phase combines Activation and Performance. The same client-approved Experiential Brief governs decisions from definition to evaluation in use.

  1. 01

    Strategic Vision

    The intention is defined. The Experiential Brief is drafted.

    Brief drafted
  2. 02

    Experience Definition

    The intended experience becomes a client-approved standard.

    Client signs the Brief
  3. 03

    Design Governance

    Design, cost and substitution proposals are evaluated against the Brief.

    Client decides
  4. 04

    Delivery Discipline

    Material programme and change decisions are assessed against the Brief.

    Client decides
  5. 05

    Activation

    Opening readiness is considered against the intended experience.

    Client decides
  6. 06

    Performance

    The experience in use is reviewed against the agreed standard.

    Client decides

ARCHITECTURAL STUDIES ARE ILLUSTRATIVE. NOT AVIORE PROJECTS.

THE EXPERIENTIAL BRIEFDrafted in Strategic Vision. Signed during Experience Definition. The governing reference thereafter.AVIORE evaluates. The client decides.
  1. 01INTENTION

    Strategic
    Vision

    Define the experience with the principal and draft the Experiential Brief.

    BRIEF DRAFTED
  2. 02THE STANDARD

    Experience
    Definition

    Set the standard in the Experiential Brief, signed by the client.

    CLIENT SIGNS THE BRIEF
  3. 03DESIGN AND COST

    Design
    Governance

    Assess every design, value-engineering and substitution proposal against the Brief. Give a written opinion before the client decides.

    CLIENT DECIDES
  4. 04COST, PROGRAMME, CHANGE

    Delivery
    Discipline

    Test cost, programme and change decisions against the Brief before deviations are built.

    CLIENT DECIDES
  5. 05OPENING AND BEYOND

    Activation
    and Performance

    Govern opening readiness, brief the opening team on the Brief and assess first-period performance against it.

    CLIENT DECIDES
EXPERIENTIAL BRIEF DRAFTEDTHE SIGNED EXPERIENTIAL BRIEF GOVERNS EVERY MATERIAL DECISION. THE CLIENT DECIDES.
01 AND 02 / THE GOVERNING REFERENCESTRATEGIC VISION AND EXPERIENCE DEFINITION

The Brief is the reference.
The client makes the decision.

The Experiential Brief is a precise, client-signed definition of the experience a project must deliver. It is drafted in Strategic Vision, Phase 01, and signed by the client in Experience Definition, Phase 02.

From Phase 03 onwards, every material design, cost, programme and change proposal is assessed against it in writing before the client decides. Commercial and programme decisions are a governing discipline across Phases 03 and 04, not an additional phase.

THE EXPERIENTIAL BRIEF
AVIORE / THE GOVERNING ARTEFACT01 / 02
The
Experiential
Brief.
WHAT SHOULD THE FINISHED ENVIRONMENT MAKE SOMEONE FEEL?
INTENDED EXPERIENCEJOURNEY AND MOMENTSGOVERNING STANDARDS
ILLUSTRATIVE. NOT CLIENT WORK. NOT ASSESSED.

The booklet shown is an illustrative specimen, not an issued AVIORE client document.

03 / DESIGN GOVERNANCETHE DECISION BEFORE THE DECISION
Concept architectural material samples laid out on a dark table beneath soft directional light
MATERIAL. COST. EXPERIENCE.

A lower price is not
the whole decision.

Value engineering, substitutions and design changes must be assessed for what they do to the experience, as well as to the cost. AVIORE provides a written assessment against the signed Brief. The client decides, and the decision is recorded.

01

Material proposal

02

Written assessment

03

Client decision

04

Recorded acceptance or exception

ILLUSTRATIVE. NOT CLIENT WORK. NOT ASSESSED.
04 / DELIVERY DISCIPLINEINTENT UNDER PRESSURE

The programme moves.
The standard stays.

Delivery brings pressure: programme compression, provisional fixes, substitutions and value engineering under time constraints.

AVIORE evaluates each material cost, programme and change decision against the Brief so departures from the intended experience are considered before they are built.

Under a governance mandate AVIORE defines and evaluates. It does not instruct contractors, place orders or negotiate commercial terms. The client's appointed project and contractor teams execute.

WHAT GOVERNANCE HOLDS TO THE STANDARD
01Programme compressionASSESS
02SubstitutionsASSESS
03Cost decisionsASSESS
04Change in deliveryASSESS

Each decision returns to the intended experience.

GOVERNANCE MANDATE

Define the standard. Evaluate material decisions. The client retains authority.

OR
DELIVERY MANDATE

Programme and delivery leadership, cost and commercial management, procurement and vendor management.

Two distinct roles. Never both on the same project.

05 / ACTIVATION AND PERFORMANCETHE EXPERIENCE IN USE

A project opens.
The experience begins.

The final weeks can quietly trade away what was defined at the beginning. Opening readiness is governed against the Experiential Brief, not treated simply as a construction handover.

AVIORE briefs the opening team on what the space is intended to make people feel and why. The operator trains its own service procedures. AVIORE assesses whether readiness and first-period performance deliver the defined experience.

ACTIVATION AND PERFORMANCE
FROM THE SIGNED STANDARD TO OPENING
01Defined experienceTHE BRIEF
02Opening readinessGOVERNED
03Opening team briefingTHE INTENT
04First-period performanceASSESSED
ONE STANDARD THROUGH TO USE.
06 / METHOD AND ENGAGEMENTTWO DIFFERENT THINGS

The Method is how AVIORE governs.
An engagement is how you appoint it.

The five phases describe the governing work. The six engagements below describe the role AVIORE is appointed to perform, from the full Method to an independent Governance Readiness Audit.

07 / NEXT STEP

Give experience a governing standard.

For a project already in design or delivery, the Governance Readiness Audit examines the governance in place and identifies the first exposure point. It carries no obligation to appoint AVIORE afterwards.